The Parkside Gritting Plan

PRIORITY ORDER

  1. The Parkside Junction with N Witham Road
  2. Footpath from The Parkside to Harrington Way (slope)
  3. North Witham Road Slope Grit as required to keep route open ( additional to LCC gritting)
  4. If required can be used for to grit Halford Close and Coverely Road Slopes